Properly lining up panels is key to a clean installation. Steelhead uses high strength steel guidewalls for the best support which means clean lines for your seawall
![IMG_3531.jpeg](https://static.wixstatic.com/media/45fa24_376bed0b42c04bdeace88cd5c0b8ff26~mv2.jpeg/v1/crop/x_311,y_0,w_3410,h_3024/fill/w_680,h_603,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_3531.jpeg)
Installation of approximately 1400 linear ft of 24' Tall High Strength composite panels. Steelhead is capable of taking on any size seawall project with our large labor force and machinery fleet.
![IMG_3549.jpeg](https://static.wixstatic.com/media/45fa24_99038eb77cca4034a226296d93d71221~mv2.jpeg/v1/crop/x_311,y_0,w_3410,h_3024/fill/w_680,h_603,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_3549.jpeg)
Installation of 25' Helical anchor tiebacks. Helicals can be a good option when there is not enough space to get depth for anchoring. These anchors were precisely set at 25 degree descending angle.
![IMG_3555.jpeg](https://static.wixstatic.com/media/45fa24_157c167b523549d6bc69016e2269557d~mv2.jpeg/v1/crop/x_311,y_0,w_3410,h_3024/fill/w_680,h_603,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_3555.jpeg)
Field tests are key component prior to installation of anchoring system to determine strength and depth of anchoring system. Borings are done prior for engineering but field testing must be done to confirm final engineered design.
![IMG_3430.jpeg](https://static.wixstatic.com/media/45fa24_8ec4cc344caa4501a63b0dbb45083a5c~mv2.jpeg/v1/crop/x_311,y_0,w_3410,h_3024/fill/w_680,h_603,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_3430.jpeg)
Understanding the process of how to obtain water from the ocean to allow for water jetting of armoring panels is very important to speed and precision of the installation
![IMG_3434.jpeg](https://static.wixstatic.com/media/45fa24_9762e8275bc844f2b0cee259cb8b750f~mv2.jpeg/v1/crop/x_311,y_0,w_3410,h_3024/fill/w_680,h_603,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_3434.jpeg)
Concrete Cap forming installation. The concrete cap adds strength to the panels and also encases all of the tieback connections